tm16

Project title

Langley Park School for Girls Music Hall Alterations – New Auditorium Block

 

Site Address

Hawksbrook Ln, South Eden Park Road, Beckenham BR3 3BE

 

Client

Langley Park Learning Trust

 

Instructions to Contractors

Our enquiry to you is formed of all documents referenced and titled below.  Please review all documents to ensure that you are aware of all works relative to our enquiry to you.  No variation will be considered for want of information that is already currently available or that which can be requested during the tender period.

M&E Contractors:  Notice.

Some tender documents contain a specific M&E schedule of works.  Additional M&E works not contained within the M&E schedule of works may also be referred to within the architectural specifications.  Please review all documents to ensure total package inclusion.  No claim for variation during the construction period will be accepted for lack of review of the total trade liability.

Returning your price/quotation/tender

Please price the tender document provided only and submit with your cover letter.  DO NOT reformat the tender documents.

Return your document to laurabennett@gbg.uk.com on or before the date given in our enquiry to you.

Fixed price labour only contracts (contract secured opportunities)

If you are looking for fixed price building, refurbishment, plumbing trade packages then you must review the document as provided below.  The prices indicated are the rates that we want to place this subcontract element on a fixed price agreement to self employed subcontractors.  You may offer an alternative price for consideration.  All packages are lump sum based upon numbered documents inclusive of overheads, profit, your supervisory costs and subject to deductions as set out within the simplified summary provided below.  Please review the main tender document within the contents below including drawings and contract obligations.  The fixed price offer agreement that we may enter into with you or your company is not transferrable and is the property of Gowlain Building Group Contractors Ltd.  The agreement is copyright Gowlain Building Group 2014.

      Content headings as follows

  • Pre-construction (health and safety plans, risk assessments, etc.)
  • Preliminaries ( contract terms, warranties, contract duration)
  • Material and workmanship (architects/designers specifications)
  • Updates during tender period (review prior to submission)
  • Schedules of Building work (Bill of Quantities, schedules and specifications)
  • M&E specifications. (Contractor to review all documents to identify independent M&E items)
  • Structural engineer specifications
  • Architectural drawings
  • M&E Drawings
  • Structural engineer drawings
  • Videos and Photo’s of site environment (pre tender)
  • Fixed price offer document summary of Labour only fixed price contract
  • Fixed Price offer documents (For review by Self employed subcontractors labour only)

Pre-construction (health and safety plans, risk assessments, etc.)

  • None included

 

Preliminaries ( contract terms, warranties, contract durations)

 

Material and workmanship (architects/designers specifications)

  • None included

 

Schedules of Building work (Bill of Quantities, schedules and specifications)

 

Mechanical and Electrical Specifications

 

Structural specifications. (Contractor to review all documents to identify independent M&E items)

 

Operation and Maintenance Manuals, Guarantees’, Certificates of completion.

Where your company is required to provide one or more of the above. (This list is not exhaustive).  For the purpose all contracts throughout the UK these elements are classified as being part of the contract works and therefore must be provided by the Contractor in order to fulfil the contractor’s obligation under the contract.  Contract Administrators are entitled and do withhold final account payments and release of retention until such time as this information is provided.   Our enquiries to you therefore are prescribed as follows.  Your company cannot withhold such information as described above pending release of retention, interim or penultimate certificate.  Throughout the construction phase valuation process therefore a sum of £500.00 shall automatically be withheld from your valuations until such time as your company releases the above described information for projects up to £25,000.00 in value.  For projects above £25,000.00 the sum shall be £1000.00 until such time as the information is provided and accepted by the Contract Administrator on behalf of the employer.

Architectural Drawings

tm16-LPSG_07_A_EXISTING ELEVATION & SECTION
tm16-LPSG_06_A_EXISTING GROUND FLOOR PLAN tm16-LPSG_05_A_EXISTING ROOF PLAN
tm16-LPSG_02_A_EXISTING SITE PLAN tm16-LPSG_01_A_EXISTING LOCATION PLAN
tm16-LPSG_52_A_PROPOSED STAIR & RAMP_SHEET 1 tm16-LPSG_42__PROPOSED CROSS SECTION THROUGH EXITING ROOF
tm16-LPSG_36_C_FLOOR FINISHES tm16-LPSG_35_A_RCP SERVICES
tm16-LPSG_34_B_RCP FINISHES tm16-LPSG_33_B_PROPOSED WORKS PLAN
tm16-LPSG_32_B_GA PLAN tm16-LPSG_31_B_ROOF PLAN
tm16-LPSG_21_B_DEMOLITION PLAN tm16-LPSG_18_E_PROPOSED ELEVATIONS
tm16-LPSG_17_E_PROPOSED ELEVATION & SECTION tm16-LPSG_08_A_EXISTING ELEVATIONS

 

Mechanical and Electrical Drawings

tm16-T 5130 EG 00 PL E64 001-PROPOSED ELV LAYOUT tm16-T 5130 EG 00 PL E63 001-PROPOSED LIGHTING LAYOUT
tm16-T 5130 EG 00 PL E62 001-PROPOSED SMALL POWER LAYOUT tm16-T 5130 EG 00 PL E61 001-PROPOSED CONTAINMENT LAYOUT
tm16-T 5130 EG 00 PL M57 001-VENTILATION LAYOUT tm16-T 5130 EG 00 PL M56 001 A-PROPOSED HEATING LAYOUT
tm16-T 5130 EG 00 PL M52 001-PROPOSED RAINWATER DRAINAGE LAYOUT tm16-T 5130 EG 00 PL E67 001-PROPOSED FIRE ALARM LAYOUT

 

Structural Drawings

tm16-BPL-XX-GF-DR-S-0001 REV P02-PLAN AND SECTION GROUND FLOOR LEVEL tm16-BPL-XX-GF-DR-S-0001 REV P03-PLAN AND SECTION GROUND FLOOR LEVEL
 tm16-BPL-XX-GF-DR-S-0002 REV P02-PLAN AND SECTION-STRUCTURE OVER GROUND FLOOR LEVEL

 

Videos and Photo’s of site environment (pre tender)