Project title
CTC BUILDING CONVERSION TO WORKSHOP AND OFFICES.
SOUTH LONDON AND MAUDSLEY NHS TRUST
Site Address
DENMARK HILL. LONDON. SE5
Client
SOUTH LONDON AND MAUDSLEY NHS TRUST
Instructions to Contractors
Our enquiry to you is formed of all documents referenced and titled below. Please review all documents to ensure that you are aware of all works relative to our enquiry to you. No variation will be considered for want of information that is already currently available or that which can be requested during the tender period.
Returning your price/quotation/tender
Please price the tender document provided only and submit with your cover letter. DO NOT reformat the tender documents.
Return your document to terrygannon@gbg.uk.com on or before the date given in our enquiry to you.
Fixed price labour only contracts (contract secured opportunities)
If you are looking for fixed price building, refurbishment, plumbing trade packages then you must review the document as provided below. The prices indicated are the rates that we want to place this subcontract element on a fixed price agreement to self employed subcontractors. You may offer an alternative price for consideration. All packages are lump sum based upon numbered documents inclusive of overheads, profit, your supervisory costs and subject to deductions as set out within the simplified summary provided below. Please review the main tender document within the contents below including drawings and contract obligations. The fixed price offer agreement that we may enter into with you or your company is not transferrable and is the property of Gowlain Building Group Contractors Ltd. The agreement is copyright Gowlain Building Group 2014.
Content headings as follows
- Pre-construction (health and safety plans, risk assessments, etc.)
- Preliminaries ( contract terms, warranties, contract duration)
- Material and workmanship (architects/designers specifications)
- Updates during tender period (review prior to submission)
- Schedules of Building work (Bill of Quantities, schedules and specifications)
- M&E specifications. (Contractor to review all documents to identify independent M&E items)
- Structural engineer specifications
- Architectural drawings
- M&E Drawings
- Structural engineer drawings
- Videos and Photo’s of site environment (pre tender)
- Fixed price offer document summary of Labour only fixed price contract
- Fixed Price offer documents (For review by Self employed subcontractors labour only)
Pre-construction (health and safety plans, risk assessments, etc.)
Preliminaries ( contract terms, warranties, contract durations)
- SEE SCHEDULE OF WORKS DOCUMENT
Material and workmanship (architects/designers specifications)
- SEE SCHEDULE OF WORKS DOCUMENT
Schedules of Building work (Bill of Quantities, schedules and specifications)
M&E specifications. (Contractor to review all documents to identify independent M&E items)
- 220509-CPW-XX-XX-SP-E-000001 – MEP Stage 4 Specification
- CTC Workshop – Tender Checklist – August 2023
- Mechanical and Electrical Tender Analysis
M&E Contractors: Notice.
Some tender documents contain a specific M&E schedule of works. Additional M&E works not contained within the M&E schedule of works may also be referred to within the architectural specifications. Please review all documents to ensure total package inclusion. No claim for variation during the construction period will be accepted for lack of review of the total trade liability.
Operation and Maintenance Manuals, Guarantees’, Certificates of completion.
Where your company is required to provide one or more of the above. (This list is not exhaustive). For the purpose all contracts throughout the UK these elements are classified as being part of the contract works and therefore must be provided by the Contractor in order to fulfil the contractor’s obligation under the contract. Contract Administrators are entitled and do withhold final account payments and release of retention until such time as this information is provided. Our enquiries to you therefore are prescribed as follows. Your company cannot withhold such information as described above pending release of retention, interim or penultimate certificate. Throughout the construction phase valuation process therefore a sum of £500.00 shall automatically be withheld from your valuations until such time as your company releases the above described information for projects up to £25,000.00 in value. For projects above £25,000.00 the sum shall be £1000.00 until such time as the information is provided and accepted by the Contract Administrator on behalf of the employer.
Architectural drawings
5087 Room Data Sheets Final 04.08.2023
5087-100-T1 EXISTING FLOOR PLAN
5087-120-T2 PROPOSED SETTING OUT
5087-140-T2 PROPOSED FIRE STRA
TEGY 5087-141-T2 PROPOSED FIRE STRATEGY
5087-200-T2 EXISTING ELEVATIONS
- 5087-201-T2 PROPOSED ELEVATIONS
- 5087-205-T2 PROPOSED FENCE
- 5087-206-T2 PROPOSED FENCE
- 5087-310-T2 STAFF SHOWEER
- 5087-311-T2 STAFF AND PUBLIC WCS
- 5087-312-T2 PROPOSED SECTIONS
- 5087-313-T1 PROPOSED RAMP
- 5087-330-T2 PARTITION DETAILS
- 5087-331-T2 (1) BRICK DETAILS
- 5087-332-T2 PROPOSED EXTERNAL DOORSETS
- 5087-333-T2 FIRE PROOFING
- 5087-334-T1 FLOORING PROPOSED BOXING DETAIL
- 5087-335-T1 GLAZED SCREEEN
- 5087-336-T1 BOLLARD AND DRAINAGE
- 5087-341-T2 WINDOW ELEVATIONS
- 5087-350-T2 WC ELEVATIONS
- 5087-351-T2 CLEANERS ROOM
- 5087-352-T2 FEMALE WC ELEVATIONS
- 5087-353-T2 LOCKER ROOM
- 5087-354-T2 SUPERVISORS OFFICE
- 5087-355-T2 LOCKSMITHS
- 5087-356-T2 MECHANICAL WORKSHOP
- 5087-357-T2 (1) MECHANICAL WORKSHOP STORE
- 5087-358-T2 LOBBY
- 5087-359-T2 (1) SHOWER ROOM
- 5087-360-T2 WC
- 5087-361-T2 WOOD WORKSHOP
- 5087-362-T2 (1) WOOD WORKSHOP
- 5087-363-T2 WORKSHOP STORE
- 5087-364-T2 ELECTRICAL WORKSHOP
- 5087-365-T2 AP OFFICE
- 5087-366-T2 PAINT SHOP
- 5087-600-T2 EXISTING SITE PLAN
- 5087-610-T1 PROPOSED SITE PLAN
- 5087-SK1-P1 PROPOSED CLEANERS FEASIBILITY PLAN
M&E Drawings
- 220258-CPW-XX-XX-DR-M-30001 – Mechanical Services Strip Out Drawing Ground Floor – T01 230114-CPW-XX-00-DR-E-00001 – Proposed Strip Out Layout
- 230114-CPW-XX-XX-DC-N-00001_Task Information Delivery Plan
- 230114-CPW-ZZ-00-DR-E-210001 – Proposed Small Power and Data Layout
- 230114-CPW-ZZ-00-DR-E-211001 – Proposed Electrical Containment Layout
- 230114-CPW-ZZ-00-DR-E-220001 – Proposed Lighting Layout
- 230114-CPW-ZZ-00-DR-E-240001 – Proposed Fire Alarm Layout
- 230114-CPW-ZZ-00-DR-E-251001 – Proposed Access Control and Security Layout
- 230114-CPW-ZZ-00-DR-M-12101 – Proposed HVAC Layout
- 230114-CPW-ZZ-00-DR-M-12201 – Proposed Domestic Services Layout
- 230114-CPW-ZZ-XX-DR-E-001001 – LV Schematic Layout
- 230114-CPW-ZZ-XX-DR-M-021001 – LTHW Primary Heating Schematic – T01
- 230114-CPW-ZZ-XX-DR-M-021002 – LTHW Secondary Heating Schematic – T01
- 230114-CPW-ZZ-XX-DR-M-022001 – Domestic Water Services Schematic -T01 Dept Ext of Assessment Unit Telephones and Fire Alarm
Extension of Assessment Unit – Heating
Layouts of Boiler Plant and Tank Room Record Drawing
Maudsley Hospital SE5 CCTV Survey
OT Dept Ext of Assessment Unit Electrical Schematic and Distribution Board Detail (2)
OT Dept Ext of Assessment Unit Electrical Schematic and Distribution Board Detail
OT Dept Ext of Assessment Unit Power
OT Dept Ext of Assessment Unit Schematic-Detail of Plant Room
OT Dept Layout of Boiler Plant Record Drawing
OT Dept Layout of Domestic Water Services Record Drawing