tm30

Project title

 Welwyn Garden City Ambulance Station – Internal alterations & Refurbishment works

 

Site Address

Welwyn Garden City Ambulance Station, Ascots Lane, Welwyn Garden City, AL7 4HL.

 

Client

 East of England NHS Ambulance Service

 

Instructions to Contractors

Our enquiry to you is formed of all documents referenced and titled below.  Please review all documents to ensure that you are aware of all works relative to our enquiry to you.  No variation will be considered for want of information that is already currently available or that which can be requested during the tender period.

M&E Contractors:  Notice.

Some tender documents contain a specific M&E schedule of works.  Additional M&E works not contained within the M&E schedule of works may also be referred to within the architectural specifications.  Please review all documents to ensure total package inclusion.  No claim for variation during the construction period will be accepted for lack of review of the total trade liability.

Returning your price/quotation/tender

Please price the tender document provided only and submit with your cover letter.  DO NOT reformat the tender documents.

Return your document to priscillapacey@gbg.uk.com on or before the date given in our enquiry to you.

Fixed price labour only contracts (contract secured opportunities)

If you are looking for fixed price building, refurbishment, plumbing trade packages then you must review the document as provided below.  The prices indicated are the rates that we want to place this subcontract element on a fixed price agreement to self employed subcontractors.  You may offer an alternative price for consideration.  All packages are lump sum based upon numbered documents inclusive of overheads, profit, your supervisory costs and subject to deductions as set out within the simplified summary provided below.  Please review the main tender document within the contents below including drawings and contract obligations.  The fixed price offer agreement that we may enter into with you or your company is not transferrable and is the property of Gowlain Building Group Contractors Ltd.  The agreement is copyright Gowlain Building Group 2014.

      Content headings as follows.

  • Pre-construction (health and safety plans, risk assessments, etc.)
  • Preliminaries ( contract terms, warranties, contract durations)
  • Material and workmanship (architects/designers specifications)
  • Updates during tender period (review prior to submission)
  • Schedules of Building work (Bill of Quantities, schedules and specifications)
  • M&E specifications. (Contractor to review all documents to identify independent M&E items)
  • Structural engineer specifications
  • Architectural drawings
  • M&E Drawings
  • Structural engineer drawings
  • Videos and Photo’s of site environment (pre tender)
  • Fixed price offer document summary of Labour only fixed price contract
  • Fixed Price offer documents (For review by Self employed subcontractors labour only)

 

 

 

  • Material and workmanship (architects/designers specifications)

 

 

  • Updates during tender period (review prior to submission)

 

 

 

  • M&E specifications. (Contractor to review all documents to identify independent M&E items)

 

 

M&E Contractors:  Notice.

Some tender documents contain a specific M&E schedule of works.  Additional M&E works not contained within the M&E schedule of works may also be referred to within the architectural specifications.  Please review all documents to ensure total package inclusion.  No claim for variation during the construction period will be accepted for lack of review of the total trade liability.

 

Operation and Maintenance Manuals, Guarantees’, Certificates of completion.

Where your company is required to provide one or more of the above. (This list is not exhaustive).  For the purpose all contracts throughout the UK these elements are classified as being part of the contract works and therefore must be provided by the Contractor in order to fulfil the contractor’s obligation under the contract.  Contract Administrators are entitled and do withhold final account payments and release of retention until such time as this information is provided.   Our enquiries to you therefore are prescribed as follows.  Your company cannot withhold such information as described above pending release of retention, interim or penultimate certificate.  Throughout the construction phase valuation process therefore a sum of £500.00 shall automatically be withheld from your valuations until such time as your company releases the above described information for projects up to £25,000.00 in value.  For projects above £25,000.00 the sum shall be £1000.00 until such time as the information is provided and accepted by the Contract Administrator on behalf of the employer.

  • Structural engineer specifications

 

 

 

  • M&E Drawings

 

 

  • Structural engineer drawings

 

 

  • Fixed price offer document summary of Labour only fixed price contract

 

 

  • Fixed Price offer documents (For review by Self employed subcontractors labour only)

 

 

  • Videos and Photo’s of site environment (pre tender)

  •  tm30 IMG_1213 tm30 IMG_1214 tm30 IMG_1215 tm30 IMG_1216  tm30 IMG_1218 tm30 IMG_1219 tm30 IMG_1220  tm30 IMG_1222 tm30 IMG_1223 tm30 IMG_1224  tm30 IMG_1226 tm30 IMG_1227  tm30 IMG_1229 tm30 IMG_1231 tm30 IMG_1232   tm30 IMG_1235 tm30 IMG_1236 tm30 IMG_1237 tm30 IMG_1238 tm30 IMG_1239  tm30 IMG_1241 tm30 IMG_1242 tm30 IMG_1243 tm30 IMG_1244  tm30 IMG_1246   tm30 IMG_1249  tm30 IMG_1251  tm30 IMG_1253 tm30 IMG_1254 tm30 IMG_1255  tm30 IMG_1257 tm30 IMG_1258 tm30 IMG_1259 tm30 IMG_1260 tm30 IMG_1261 tm30 IMG_1262 tm30 IMG_1263 tm30 IMG_1264 tm30 IMG_1265 tm30 IMG_1267 tm30 IMG_1268 tm30 IMG_1269 tm30 IMG_1270 tm30 IMG_1271 tm30 IMG_1272 tm30 IMG_1273 tm30 IMG_1274 tm30 IMG_1275 tm30 IMG_1276 tm30 IMG_1280 tm30 IMG_1282 tm30 IMG_1283 tm30 IMG_1284 tm30 IMG_1285 tm30 IMG_1286 tm30 IMG_1287 tm30 IMG_1288 tm30 IMG_1289


Copyright © 2012. All Rights Reserved.