Project title
Sunridge Court
Site Address
Sunridge Court, 76 The Ridgeway, London NW11 8PT
Client
Sunridge Housing Association Ltd
Instructions to Contractors
Our enquiry to you is formed of all documents referenced and titled below. Please review all documents to ensure that you are aware of all works relative to our enquiry to you. No variation will be considered for want of information that is already currently available or that which can be requested during the tender period.
M&E Contractors: Notice.
Some tender documents contain a specific M&E schedule of works. Additional M&E works not contained within the M&E schedule of works may also be referred to within the architectural specifications. Please review all documents to ensure total package inclusion. No claim for variation during the construction period will be accepted for lack of review of the total trade liability.
Returning your price/quotation/tender
Please price the tender document provided only and submit with your cover letter. DO NOT reformat the tender documents.
Return your document to priscillapacey@gbg.uk.com on or before the date given in our enquiry to you.
Fixed price labour only contracts (contract secured opportunities)
If you are looking for fixed price building, refurbishment, plumbing trade packages then you must review the document as provided below. The prices indicated are the rates that we want to place this subcontract element on a fixed price agreement to self employed subcontractors. You may offer an alternative price for consideration. All packages are lump sum based upon numbered documents inclusive of overheads, profit, your supervisory costs and subject to deductions as set out within the simplified summary provided below. Please review the main tender document within the contents below including drawings and contract obligations. The fixed price offer agreement that we may enter into with you or your company is not transferrable and is the property of Gowlain Building Group Contractors Ltd. The agreement is copyright Gowlain Building Group 2014.
Content headings as follows.
- Pre-construction (health and safety plans, risk assessments, ect)
- Preliminaries ( contract terms, warranties, contract durations)
- Material and workmanship (architects/designers specifications)
- Updates during tender period (review prior to submission)
- Schedules of Building work (Bill of Quantities, schedules and specifications)
- M&E specifications. (Contractor to review all documents to identify independent M&E items)
- Structural engineer specifications
- Architectural drawings
- M&E Drawings
- Structural engineer drawings
- Videos and Photo’s of site environment (pre tender)
- Fixed price offer document summary of Labour only fixed price contract
- Fixed Price offer documents (For review by Self employed subcontractors labour only)
-
Pre-construction (health and safety plans, risk assessments, etc.)
-
Preliminaries ( contract terms, warranties, contract durations)
- tm29 2020-02-20 NBS Prelims
-
Material and workmanship (architects/designers specifications)
- tm29 2020-02-20 – Workmanship
-
Updates during tender period (review prior to submission)
- tm29 Scaffolding Drawings
-
Schedules of Building work (Bill of Quantities, schedules and specifications)
- tm29 2019-12-05 – Outline schedule of works
-
M&E specifications. (Contractor to review all documents to identify independent M&E items)
M&E Contractors: Notice.
Some tender documents contain a specific M&E schedule of works. Additional M&E works not contained within the M&E schedule of works may also be referred to within the architectural specifications. Please review all documents to ensure total package inclusion. No claim for variation during the construction period will be accepted for lack of review of the total trade liability.
Operation and Maintenance Manuals, Guarantees’, Certificates of completion.
Where your company is required to provide one or more of the above. (This list is not exhaustive). For the purpose all contracts throughout the UK these elements are classified as being part of the contract works and therefore must be provided by the Contractor in order to fulfil the contractor’s obligation under the contract. Contract Administrators are entitled and do withhold final account payments and release of retention until such time as this information is provided. Our enquiries to you therefore are prescribed as follows. Your company cannot withhold such information as described above pending release of retention, interim or penultimate certificate. Throughout the construction phase valuation process therefore a sum of £500.00 shall automatically be withheld from your valuations until such time as your company releases the above described information for projects up to £25,000.00 in value. For projects above £25,000.00 the sum shall be £1000.00 until such time as the information is provided and accepted by the Contract Administrator on behalf of the employer.
-
Structural engineer specifications
- tm29 Structural Calculations 1.0
-
Architectural drawings
- tm29 Construction-C01 3rd Flr Pln DEMO
- tm29 Construction-C10 3rd Flr GA Pln
- tm29 Construction-C11 North Elevation
- tm29 Construction-C12 West Elevation
- tm29 Construction-C13 Section EE & FF
- tm29 Construction-C14 South Elevation
- tm29 Construction-C15 East Elevation
- tm29 Construction-C16 Roof Pln
- tm29 Construction-C20 3rd Flr Detail Pln
- tm29 Construction-C50 Building Regs Notes
- tm29 Construction-C51 Service Symbols
- tm29 Construction-C52 3rd Flr Services Pln
- tm29 Construction-C60 Doc M Plans
- tm29 Construction-C61 Doc M Elevs
- tm29 Construction-C62 Window Schedule
- tm29 Construction-C63 WC Plan
- tm29 Construction-C70 Mansard Detail
- tm29 Construction-C71 Warm Roof and Floor
- tm29 Construction-C72 Wall Details
- tm29 Construction-C73 Parapet Details
- tm29 Construction-C74 Mansard Sill Lead Details
- tm29 Construction-C75 Mansard Dormer Cheek Lead Details
- tm29 P3623 201 C1 Third Floor Phase 1 GA
- tm29 P3623 202 C1 Third Floor GA Phase 1 showing structure over
- tm29 P3623 210 C1 Phase 1 Proposed Sections
- tm29 Scaffolding Drawings
-
M&E Drawings
-
Structural engineer drawings
-
Fixed price offer document summary of Labour only fixed price contract
-
Fixed Price offer documents (For review by Self employed subcontractors labour only)
-
Videos and Photo’s of site environment (pre tender)