tm08

Project title

Remodelling New North Watford police station

 

Site Address

 

Client

7 Forces commercial services

 

Instructions to Contractors

Our enquiry to you is formed of all documents referenced and titled below.  Please review all documents to ensure that you are aware of all works relative to our enquiry to you.  No variation will be considered for want of information that is already currently available or that which can be requested during the tender period.

M&E Contractors:  Notice

Some tender documents contain a specific M&E schedule of works.  Additional M&E works not contained within the M&E schedule of works may also be referred to within the architectural specifications.  Please review all documents to ensure total package inclusion.  No claim for variation during the construction period will be accepted for lack of review of the total trade liability.

Returning your price/quotation/tender

Please price the tender document provided only and submit with your cover letter.  DO NOT reformat the tender documents.

Return your offer to terrygannon@gbg.uk.com

on or before the date given in our enquiry to you.

Fixed price labour only contracts (contract secured opportunities)

If you are looking for fixed price building, refurbishment, plumbing trade packages then you must review the document as provided below.  The prices indicated are the rates that we want to place this subcontract element on a fixed price agreement to self employed subcontractors.  You may offer an alternative price for consideration.  All packages are lump sum based upon numbered documents inclusive of overheads, profit, your supervisory costs and subject to deductions as set out within the simplified summary provided below.  Please review the main tender document within the contents below including drawings and contract obligations.  The fixed price offer agreement that we may enter into with you or your company is not transferrable and is the property of Gowlain Building Group Contractors Ltd.  The agreement is copyright Gowlain Building Group 2014.

      Content headings as follows

  • Pre-construction (health and safety plans, risk assessments, etc.)
  • Preliminaries ( contract terms, warranties, contract duration)
  • Material and workmanship (architects/designers specifications)
  • Updates during tender period (review prior to submission)
  • Schedules of Building work (Bill of Quantities, schedules and specifications)
  • M&E specifications. (Contractor to review all documents to identify independent M&E items)
  • Structural engineer specifications
  • Architectural drawings
  • M&E Drawings
  • Structural engineer drawings
  • Videos and Photo’s of site environment (pre tender)
  • Fixed price offer document summary of Labour only fixed price contract
  • Fixed Price offer documents (For review by Self employed subcontractors labour only)

 

Pre-construction (health and safety plans, risk assessments, etc.)

  • None included

 

Preliminaries ( contract terms, warranties, contract durations)

 

Material and workmanship (architects/designers specifications)

 

Updates during tender period (review prior to submission)

  • N/A

 

Schedules of Building work (Bill of Quantities, schedules and specifications)

 

M&E specifications. (Contractor to review all documents to identify independent M&E items)

tm08 220623 MEP Specification – 2 & 3 Work Sections and Reference Sectionstm08 220623 MEP Specification – Section 4 Schedules

tm08 220623 MEP Specification – Section 1 Scopes

tm08 220623 MEP Specification – 2 & 3 Work Sections and Reference Sections

 

M&E Contractors:  Notice.

Some tender documents contain a specific M&E schedule of works.  Additional M&E works not contained within the M&E schedule of works may also be referred to within the architectural specifications.  Please review all documents to ensure total package inclusion.  No claim for variation during the construction period will be accepted for lack of review of the total trade liability.

 

Operation and Maintenance Manuals, Guarantees’, Certificates of completion

Where your company is required to provide one or more of the above. (This list is not exhaustive).  For the purpose all contracts throughout the UK these elements are classified as being part of the contract works and therefore must be provided by the Contractor in order to fulfil the contractor’s obligation under the contract.  Contract Administrators are entitled and do withhold final account payments and release of retention until such time as this information is provided.   Our enquiries to you therefore are prescribed as follows.  Your company cannot withhold such information as described above pending release of retention, interim or penultimate certificate.  Throughout the construction phase valuation process therefore a sum of £500.00 shall automatically be withheld from your valuations until such time as your company releases the above described information for projects up to £25,000.00 in value.  For projects above £25,000.00 the sum shall be £1000.00 until such time as the information is provided and accepted by the Contract Administrator on behalf of the employer.

Architectural drawings                                  MEP drawings

tm08 664-WPS-VGA-GS-RF-DR-A-00 244_A_Demolition roof plan

tm08 664-WPS-VGA-GS-RF-DR-A-00 384_D_Proposed roof firestrategy plan

tm08 7664-WPS-VGA-GS-00-DR-A-00 241_B_Demolition GF plan

tm08 7664-WPS-VGA-GS-00-DR-A-00 251_C_Proposed GF plan

tm08 7664-WPS-VGA-GS-00-DR-A-00 255_C_Proposed External works plan

tm08 7664-WPS-VGA-GS-00-DR-A-00 370_A_Proposed enlarged GF core plan

tm08 7664-WPS-VGA-GS-00-DR-A-00 381_D_Proposed GF firestrategy plan

tm08 7664-WPS-VGA-GS-01-DR-A-00 242_B_Demolition FF plan

tm08 7664-WPS-VGA-GS-01-DR-A-00 252_D_Proposed FF plan

tm08 7664-WPS-VGA-GS-01-DR-A-00 371_A_Proposed enlarged FF core plan

tm08 7664-WPS-VGA-GS-01-DR-A-00 382_D_Proposed FF firestrategy plan

tm08 7664-WPS-VGA-GS-02-DR-A-00 243_A_Demolition SF plan

tm08 7664-WPS-VGA-GS-02-DR-A-00 253_C_Proposed SF plan

tm08 7664-WPS-VGA-GS-02-DR-A-00 372_A_Proposed enlarged SF core plan

tm08 7664-WPS-VGA-GS-02-DR-A-00 383_D_Proposed SF firestrategy plan

tm08 7664-WPS-VGA-GS-BA-DR-A-00 240_A_Demolition basement plan

tm08 7664-WPS-VGA-GS-BA-DR-A-00 250_D_Proposed basement plan

tm08 7664-WPS-VGA-GS-BA-DR-A-00 360_A_Proposed basement_FF

tm08 7664-WPS-VGA-GS-BA-DR-A-00 380_C_Proposed basement firestrategy plan

tm08 7664-WPS-VGA-GS-RF-DR-A-00 254_C_Proposed roof plan

tm08 7664-WPS-VGA-GS-RF-DR-A-00 364_A_Proposed roof plan_FF

tm08 Appx 4.7 7664_WPS_Proposed plans and finishes_21.04.22

tm08 Appx 4.9 WPS Remodel Issue Register – Stage 3

tm08 first floor ceiling plan

tm08 first floor finishes

tm08 ground floor ceiling pla

tm08 ground floor finishes

tm08 internal finishes

tm08 second floor finishes

tm08 seconf floor ceiling plan

tm 08 containment first floor WPS-ACM-00-01LL-DR-EL-461006

tm08 containment basement WPS-ACM-00-B1-DR-EL-461001

tm08 containment first floor WPS-ACM-00-01-DR-EL-461003

tm08 containment ground floor WPS-ACM-00-00-DR-EL-461002

tm08 containment roof level WPS-ACM-00-03-DR-EL-461005

tm08 containment second floor WPS-ACM-00-02-DR-EL-461004

tm08 containment second floor WPS-ACM-00-02LL-DR-EL-461007

tm08 fire alarm schematic WPS-ACM-XX-XX-DR-EL-447001

tm08 lighting and fire alarm basement WPS-ACM-00-B1-DR-EL-431001

tm08 lighting and fire alarm first floor WPS-ACM-00-01-DR-EL-431003

tm08 lighting and fire alarm roof layout WPS-ACM-00-03-DR-EL-431005

tm08 lighting and fire second floor WPS-ACM-00-02-DR-EL-431004

tm08 lightng and fire alarm ground floor WPS-ACM-00-00-DR-EL-431002

tm08 lv schematic WPS-ACM-XX-XX-DR-EL-417001

tm08 small power basement WPS-ACM-00-B1-DR-EL-421001

tm08 small power first floor WPS-ACM-00-01-DR-EL-421003

tm08 small power ground floor WPS-ACM-00-00-DR-EL-421002

tm08 small power roof level PS-ACM-00-03-DR-EL-421005

tm08 small power second floor WPS-ACM-00-02-DR-EL-421004

tm08 domestic water basement WPS-ACM-00-B1-DR-PH-500001

tm08 domestic water first floor WPS-ACM-00-01-DR-PH-500003

tm08 domestic water ground floor WPS-ACM-00-00-DR-PH-500002

tm08 domestic water roof level WPS-ACM-00-03-DR-PH-500005

tm08 domestic water second floor WPS-ACM-00-02-DR-PH-500004

tm08 fire protection sprinkler basement WPS-ACM-00-B1-DR-PH-500006

tm08 fire protection sprinkler ground floor WPS-ACM-00-00-DR-PH-500007

ting services layout roof level WPS-ACM-00-03-DR-ME-300006

tm08 hvac first floor high level WPS-ACM-00-01-DR-ME-300013

tm08 hvac ground floor high level WPS-ACM-00-00-DR-ME-300012

tm08 hvac high level mechanical basement layout WPS-ACM-00-B1-DR-ME-300011

tm08 hvac second floor high level WPS-ACM-00-02-DR-ME-300014

tm08 low level mechanical ground floor WPS-ACM-00-00-DR-ME-300002

tm08 low level mechanical second floor WPS-ACM-00-02-DR-ME-300004

tm08 low level mechnical first floor WPS-ACM-00-01-DR-ME-300003

tm08 roof heating and cooling schematic WPS-ACM-XX-XX-DR-ME-340101

tm08 roof layout location plan services WPS-ACM-00-03-DR-ME-300015

 

 


Copyright © 2012. All Rights Reserved.