tm18

Project title

SLaM – NAU Decant Works in the Linen Store

Site Address

South London and Maudsley Hospital

Client

South London and Maudsley NHS Trust Foundation

 

Instructions to Contractors

Our enquiry to you is formed of all documents referenced and titled below.  Please review all documents to ensure that you are aware of all works relative to our enquiry to you.  No variation will be considered for want of information that is already currently available or that which can be requested during the tender period.

M&E Contractors:  Notice

Some tender documents contain a specific M&E schedule of works.  Additional M&E works not contained within the M&E schedule of works may also be referred to within the architectural specifications.  Please review all documents to ensure total package inclusion.  No claim for variation during the construction period will be accepted for lack of review of the total trade liability.

Returning your price/quotation/tender

Please price the tender document provided only and submit with your cover letter.  DO NOT reformat the tender documents.

Return your document to laurabennett@gbg.uk.com on or before the date given in our enquiry to you.

Fixed price labour only contracts (contract secured opportunities)

If you are looking for fixed price building, refurbishment, plumbing trade packages then you must review the document as provided below.  The prices indicated are the rates that we want to place this subcontract element on a fixed price agreement to self employed subcontractors.  You may offer an alternative price for consideration.  All packages are lump sum based upon numbered documents inclusive of overheads, profit, your supervisory costs and subject to deductions as set out within the simplified summary provided below.  Please review the main tender document within the contents below including drawings and contract obligations.  The fixed price offer agreement that we may enter into with you or your company is not transferrable and is the property of Gowlain Building Group Contractors Ltd.  The agreement is copyright Gowlain Building Group 2014.

      Content headings as follows

  • Pre-construction (health and safety plans, risk assessments, etc.)
  • Preliminaries ( contract terms, warranties, contract duration)
  • Material and workmanship (architects/designers specifications)
  • Updates during tender period (review prior to submission)
  • Schedules of Building work (Bill of Quantities, schedules and specifications)
  • M&E specifications. (Contractor to review all documents to identify independent M&E items)
  • Structural engineer specifications
  • Architectural drawings
  • M&E Drawings
  • Structural engineer drawings
  • Videos and Photo’s of site environment (pre tender)
  • Fixed price offer document summary of Labour only fixed price contract
  • Fixed Price offer documents (For review by Self employed subcontractors labour only)

Pre-construction (health and safety plans, risk assessments, etc.)

  •  None included

Preliminaries (contract terms, warranties, contract durations)

Material and workmanship (architects/designers specifications)

Updates during tender period (review prior to submission)

  •  None included

Schedules of Building work (Bill of Quantities, schedules and specifications)

M&E specifications. (Contractor to review all documents to identify independent M&E items)

 

Architectural drawings

tm18-2312_L 1701_RevA_Existing Fire Plans – Linen Store_201028 tm18-2312_L 1700_RevA_Existing Plans – Linen Store_201028
tm18-2312_A 2600_RevB_Details – Linen Store_201028 tm18-2312_A 2106_RevB_G0110_7 Linen Rejects- Linen Store_201028
tm18-2312_A 2105_RevB_G0110_6 Linen Trollies – Linen Store_201028 tm18-2312_A 2104_RevC_G0110_5 Circulation – Linen Store_201028
tm18-2312_A 2103_RevB_G0110_4 Linen Clean – Linen Store_201028 tm18-2312_A 2102_RevB_G0110_3 Linen Sorting – Linen Store_201028
tm18-2312_A 2101_RevB_G0110_1 Linen Utility & Rest – Linen Store_201028 tm18-2312_A 2100_RevB_G0125 Linen Dirty – Linen Store_201028
tm18-2312_S 4102_RevD_Room Finishes Schedules & Details – Linen Store_201028 tm18-2312_S 4101_RevA_Door, Window & Ironmongery Schedules – Linen Store_201028
tm18-2312_S 4100_RevB_Component Schedules – Linen Store_201028 tm18-2312_L 1770_RevD_Proposed Elevations & Sections – Linen Store_201028
tm18-2312_L 1762_RevC_Fire Plan – Linen Store_201028 tm18-2312_L 1761_RevD_Loaded Plan & 3d – Linen Store_201028
tm18-2312_L 1760_RevC_Setting Out Plans – Linen Store_201028 tm18-2312_L 1750_RevC_Demolition & Setting Out Plan & 3d – Linen Store_201028
tm18-2312_L 1702_RevA_Existing Services _ Ceiling Plans – Linen Store_201028 tm18-2312_L 1710_RevA_Existing Elevations – Linen Store_201028
tm18-2312_L 1711_RevA_Existing Sections – Linen Store_201028 tm18-2312_L 1749_RevB_Site Set Up & Access – Linen Store_201028

 

 

 

 

 

 

 

 


Copyright © 2012. All Rights Reserved.