tm27

Project title

 

St Martin-in-the-Fields High School for Girls, Pupil Toilet Refurbishment.

 

Site Address

St Martin-in-the-Fields High School for Girls, 155 Tulse Hill, London SW2 3UP

 

 

Client

The Governors of St Martin-in-the-Fields High School for Girls,

 

Instructions to Contractors

Our enquiry to you is formed of all documents referenced and titled below.  Please review all documents to ensure that you are aware of all works relative to our enquiry to you.  No variation will be considered for want of information that is already currently available or that which can be requested during the tender period.

M&E Contractors:  Notice.

Some tender documents contain a specific M&E schedule of works.  Additional M&E works not contained within the M&E schedule of works may also be referred to within the architectural specifications.  Please review all documents to ensure total package inclusion.  No claim for variation during the construction period will be accepted for lack of review of the total trade liability.

Returning your price/quotation/tender

Please price the tender document provided only and submit with your cover letter.  DO NOT reformat the tender documents.

Return your document to priscillapacey@gbg.uk.com on or before the date given in our enquiry to you.

Fixed price labour only contracts (contract secured opportunities)

If you are looking for fixed price building, refurbishment, plumbing trade packages then you must review the document as provided below.  The prices indicated are the rates that we want to place this subcontract element on a fixed price agreement to self employed subcontractors.  You may offer an alternative price for consideration.  All packages are lump sum based upon numbered documents inclusive of overheads, profit, your supervisory costs and subject to deductions as set out within the simplified summary provided below.  Please review the main tender document within the contents below including drawings and contract obligations.  The fixed price offer agreement that we may enter into with you or your company is not transferrable and is the property of Gowlain Building Group Contractors Ltd.  The agreement is copyright Gowlain Building Group 2014.

      Content headings as follows.

  • Pre-construction (health and safety plans, risk assessments, etc.)
  • Preliminaries ( contract terms, warranties, contract durations)
  • Material and workmanship (architects/designers specifications)
  • Updates during tender period (review prior to submission)
  • Schedules of Building work (Bill of Quantities, schedules and specifications)
  • M&E specifications. (Contractor to review all documents to identify independent M&E items)
  • Structural engineer specifications
  • Architectural drawings
  • M&E Drawings
  • Structural engineer drawings
  • Videos and Photo’s of site environment (pre tender)
  • Fixed price offer document summary of Labour only fixed price contract
  • Fixed Price offer documents (For review by Self employed subcontractors labour only)

 

  • Pre-construction (health and safety plans, risk assessments, etc.)

 

 

 

  • Material and workmanship (architects/designers specifications)

 

 

  • Updates during tender period (review prior to submission)

 

 

 

  • M&E specifications. (Contractor to review all documents to identify independent M&E items)

 

 

M&E Contractors:  Notice.

Some tender documents contain a specific M&E schedule of works.  Additional M&E works not contained within the M&E schedule of works may also be referred to within the architectural specifications.  Please review all documents to ensure total package inclusion.  No claim for variation during the construction period will be accepted for lack of review of the total trade liability.

 

Operation and Maintenance Manuals, Guarantees’, Certificates of completion.

Where your company is required to provide one or more of the above. (This list is not exhaustive).  For the purpose all contracts throughout the UK these elements are classified as being part of the contract works and therefore must be provided by the Contractor in order to fulfil the contractor’s obligation under the contract.  Contract Administrators are entitled and do withhold final account payments and release of retention until such time as this information is provided.   Our enquiries to you therefore are prescribed as follows.  Your company cannot withhold such information as described above pending release of retention, interim or penultimate certificate.  Throughout the construction phase valuation process therefore a sum of £500.00 shall automatically be withheld from your valuations until such time as your company releases the above described information for projects up to £25,000.00 in value.  For projects above £25,000.00 the sum shall be £1000.00 until such time as the information is provided and accepted by the Contract Administrator on behalf of the employer.

  • Structural engineer specifications

 

 

 

 

  • M&E Drawings

 

 

 

  • Structural engineer drawings

 

 

  • Fixed price offer document summary of Labour only fixed price contract

 

 

 

  • Fixed Price offer documents (For review by Self employed subcontractors labour only)

 

 

 

  • Videos and Photo’s of site environment (pre tender)

  •  tm27 Gr floor cubicle feed pipe tm27 Gr floor cubicles over view tm27 Gr floor electrics tm27 Gr floor external 1 tm27 Gr floor external close of mez floor stack tm27 Gr floor external soil stack close up to mez floor tm27 Gr floor general over view 2 tm27 Gr floor sub fuse board tm27 Gr floor vanity unit over view tm27 Gr floor vanity unit tm27 Mez general over view 1 tm27 mezz cubicle & water feeds tm27 Mezz cubicle with stack to compound side tm27 Mezz front wall tm27 Mezz general over view tm27 Mezz pipe feeds to vanity unit tm27 Mezz pipe valves tm27 Mezz rad by vanity unit tm27 Mezz rad under front windows tm27 Mezz vanity unit veiw
  • tm27 Compound entrance and shed tm27 Entrance road from front gates looking down to compound area tm27 Entrance road leading to front gates tm27 Gr floor beam depth tm27 Gr floor beam height tm27 Gr floor Corridor tm27 Gr floor cubicle example tm27 Gr floor cubicle tm27 Gr floor electrics close up tm27 Gr floor external 2 tm27 Gr floor external close of mez floor stack tm27 Gr floor external close up for new external door tm27 Gr floor external compound area tm27 Gr floor external compound soil stack 1 tm27 Gr floor external compound soil stack tm27 Gr floor external entrance road to compound tm27 Gr floor external mez soil stack close up tm27 Gr floor external new door location tm27 Gr floor external soil stack close up to mez floor tm27 Gr floor external soil stack to external corner tm27 Gr floor external soil stacks & side entrance tm27 Gr floor external tm27 Gr floor floor over paint tm27 Gr floor general over view tm27 Gr floor new entrance location tm27 Gr floor paint to floor tm27 Gr floor possible asbestos panel tm27 Gr floor rad and feed tm27 Gr floor rad and pipes tm27 Gr floor rad tm27 Gr floor sub fuse board & toilets tm27 Gr floor sub fuse board tm27 Main frontage of school for recpetion tm27 Mez general over view 1 tm27 Mezz corridor and stairs lobby tm27 Mezz cubicle & general pipe tm27 mezz cubicle & water feeds tm27 Mezz cubicle with stack to compound side tm27 Mezz entrance & various pipes tm27 Mezz front wall tm27 Mezz general over view tm27 Mezz pipe feeds to vanity unit tm27 Mezz rad by vanity unit tm27 Mezz rad under front windows tm27 Mezz windows, same to both floors

 

 

 

 

 


Copyright © 2012. All Rights Reserved.