tm07
Project title
Cyril Jackson Primary School – South Building Entrance
Site Address
Cyril Jackson Primary School, Limehouse Causeway, London, E14 8BN
Client
The Governors of Cyril Jackson Primary School
Instructions to Contractors
Our enquiry to you is formed of all documents referenced and titled below. Please review all documents to ensure that you are aware of all works relative to our enquiry to you. No variation will be considered for want of information that is already currently available or that which can be requested during the tender period. M&E Contractors: Notice. Some tender documents contain a specific M&E schedule of works. Additional M&E works not contained within the M&E schedule of works may also be referred to within the architectural specifications. Please review all documents to ensure total package inclusion. No claim for variation during the construction period will be accepted for lack of review of the total trade liability.
Returning your price/quotation/tender
Please price the tender document provided only and submit with your cover letter. DO NOT reformat the tender documents. Return your document to laurabennett@gbg.uk.com on or before the date given in our enquiry to you.
Fixed price labour only contracts (contract secured opportunities)
If you are looking for fixed price building, refurbishment, plumbing trade packages then you must review the document as provided below. The prices indicated are the rates that we want to place this subcontract element on a fixed price agreement to self employed subcontractors. You may offer an alternative price for consideration. All packages are lump sum based upon numbered documents inclusive of overheads, profit, your supervisory costs and subject to deductions as set out within the simplified summary provided below. Please review the main tender document within the contents below including drawings and contract obligations. The fixed price offer agreement that we may enter into with you or your company is not transferrable and is the property of Gowlain Building Group Contractors Ltd. The agreement is copyright Gowlain Building Group 2014.
Content headings as follows
- Pre-construction (health and safety plans, risk assessments, etc)
- Preliminaries ( contract terms, warranties, contract duration)
- Material and workmanship (architects/designers specifications)
- Updates during tender period (review prior to submission)
- Schedules of Building work (Bill of Quantities, schedules and specifications)
- M&E specifications. (Contractor to review all documents to identify independent M&E items)
- Structural engineer specifications
- Architectural drawings
- M&E Drawings
- Structural engineer drawings
- Videos and Photo’s of site environment (pre tender)
- Fixed price offer document summary of Labour only fixed price contract
- Fixed Price offer documents (For review by Self employed subcontractors labour only)
-
Pre-construction (health and safety plans, risk assessments, etc)
-
tm07 Pre_Construction HS Plan
-
Preliminaries ( contract terms, warranties, contract durations)
-
tm07 Contract Preliminaries
-
tm07 Specific Preliminaries
-
Material and workmanship (architects/designers specifications)
-
Updates during tender period (review prior to submission)
-
Schedules of Building work (Bill of Quantities, schedules and specifications)
- tm07 WORK PRICING DOC
- tm07_OutlineSpecification T1
- tm07 KHL SPC 005 Piling
-
M&E specifications. (Contractor to review all documents to identify independent M&E items)
- tm07 WORK PRICING DOC
M&E Contractors: Notice. Some tender documents contain a specific M&E schedule of works. Additional M&E works not contained within the M&E schedule of works may also be referred to within the architectural specifications. Please review all documents to ensure total package inclusion. No claim for variation during the construction period will be accepted for lack of review of the total trade liability. Operation and Maintenance Manuals, Guarantees’, Certificates of completion. Where your company is required to provide one or more of the above. (This list is not exhaustive). For the purpose all contracts throughout the UK these elements are classified as being part of the contract works and therefore must be provided by the Contractor in order to fulfil the contractor’s obligation under the contract. Contract Administrators are entitled and do withhold final account payments and release of retention until such time as this information is provided. Our enquiries to you therefore are prescribed as follows. Your company cannot withhold such information as described above pending release of retention, interim or penultimate certificate. Throughout the construction phase valuation process therefore a sum of £500.00 shall automatically be withheld from your valuations until such time as your company releases the above described information for projects up to £25,000.00 in value. For projects above £25,000.00 the sum shall be £1000.00 until such time as the information is provided and accepted by the Contract Administrator on behalf of the employer.
-
Structural engineer specifications
-
Architectural drawings
- tm07 KHL-CJ-10-DR-S-20110 Roof GA Plan
- tm07 KHL-CJ-00-DR-S-27100 RaftTop and Bottom Reinforcement Details
- tm07 KHL-CJ-00-DR-S-26100 Demolition Scope
- tm07 KHL-CJ-00-DR-S-20100 Foundation GA Plan
- tm07 KHL-CJ-00-DR-C-28100 Drainage Layout Plan
- tm07 19.010_DWG_TE_77_500 Proposed WC Layout-A1
- tm07 19.010_DWG_TE_38_000 Compound and Site set-up plan-A1
- tm07 19.010_DWG_TE_35_210 Proposed Reflected Ceiling Plan-A1
- tm07 19.010_DWG_TE_31_612 Hopper and rainwater pipe detail-A1
- tm07 19.010_DWG_TE_31_611 Entrance Foyer seat and planter-A1
- tm07 19.010_DWG_TE_31_610 Typical Build-ups-A1
- tm07 19.010_DWG_TE_31_609 Door opening detail – Ex. Entrance to Reception-A1
- tm07 19.010_DWG_TE_31_608 Reception desk opening detail-A1
- tm07 19.010_DWG_TE_31_607 External door detail-A1
- tm07 19.010_DWG_TE_31_606 Brick opening detail – Staff room to Reception-A1
- tm07 19.010_DWG_TE_31_605 External canopy detail-A1
- tm07 19.010_DWG_TE_31_604 Roof interface detail (existing metal roof)-A1
- tm07 19.010_DWG_TE_31_603 Roof interface detail (brick wall)-A1
- tm07 19.010_DWG_TE_31_602 Window seat details-A1
- tm07 19.010_DWG_TE_31_601 Typical window detail-A1
- tm07 19.010_DWG_TE_31_600 Perimeter Detail-A1
- tm07 19.010_DWG_TE_31_501 Internal door schedule-A1
- tm07 19.010_DWG_TE_31_500 External Windows and door schedule-A1
- tm07 19.010_DWG_TE_00_240 Proposed Sections-A1
- tm07 19.010_DWG_TE_00_230 Proposed Elevations-A1
- tm07 19.010_DWG_TE_00_222 Proposed Roof Plan-A1
- tm07 19.010_DWG_TE_00_220 Proposed Ground Floor Plan-A1
- tm07 19.010_DWG_TE_00_140 Existing Sections-A1
- tm07 19.010_DWG_TE_00_130 Existing Elevations-A1
- tm07 19.010_DWG_TE_00_122 Existing Roof Plan-A1
- tm07 19.010_DWG_TE_00_120 Existing Ground Floor Plan w demolition-A1
- tm07 19.010_DWG_TE_00_002 Existing Site Photos-A3
- tm07 19.010_DWG_TE_00_001 Location Plan-A3
-
M&E Drawings
- tm07 19.010_DWG_TE_00_270 Proposed pluming and mechanical-A1
- tm07 19.010_DWG_TE_00_260 Proposed electrical and data-A1
-
Structural engineer drawings
-
Fixed price offer document summary of labour only fixed price contract
-
Fixed Price offer documents (For review by Self employed subcontractors labour only)
-
Videos and Photos of site environment (pre tender)